OK all I do hope the shop get this thig back together. It is in the shop for a valve job. I do belive that it will be getting a new HEAD GASKET right. It will also be getting a new timing chain, new water pump, all new hoses, etc. I do hope this thing runs like new when I get it bach. I paid 4k for the rig. The job that is getting done on it is going to be about 2k. The rig is mint in and out, and I do mean mint. Give me some feed back on this. looking forward to your info. Check out the pics.

http://i40.photobucket.com/albums/e2...s/P5240003.jpg

http://i40.photobucket.com/albums/e2...ts/06_12_0.jpg